Productivity Improvement through Time Study Analysis
Practical Implementation
(Sprache: Englisch)
This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing...
Jetzt vorbestellen
versandkostenfrei
Buch (Kartoniert)
66.80 €
- Lastschrift, Kreditkarte, Paypal, Rechnung
- Kostenlose Rücksendung
- Ratenzahlung möglich
Produktdetails
Produktinformationen zu „Productivity Improvement through Time Study Analysis “
Klappentext zu „Productivity Improvement through Time Study Analysis “
This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace.
Autoren-Porträt von Ali Akbar Jaffery, Muhammad Umair Akbar, Muhammad Jahanzaib
Ali Akbar is currently serving as Lecturer in Industrial Engineering and Management department at the Dawood University of Engineering & Technology Karachi, Pakistan.Presently, he is pursuing his MSc in Mechanical Engineering from Universiti Teknologi PETRONAS (UTP) Malaysia.
Bibliographische Angaben
- Autoren: Ali Akbar Jaffery , Muhammad Umair Akbar , Muhammad Jahanzaib
- 2018, 188 Seiten, Maße: 15 x 22 cm, Kartoniert (TB), Englisch
- Verlag: LAP Lambert Academic Publishing
- ISBN-10: 6134973645
- ISBN-13: 9786134973649
- Erscheinungsdatum: 29.01.2018
Sprache:
Englisch
Kommentar zu "Productivity Improvement through Time Study Analysis"
Schreiben Sie einen Kommentar zu "Productivity Improvement through Time Study Analysis".
Kommentar verfassen